San Francisco / Mission / 33 Norfolk St

33 Norfolk St

19-unit 5-story residential project to erect 5 stories, no basement, type v-a/i-a, 19 residential units and parking building

Complete19 UnitsAB 2011 MinisterialDBI Valuation $4.9M
Entitlement
Plan Check
Jun 2019
Awaiting Issuance
Jun 2019
Post-Issuance Addenda
Construction
Complete
Permit Filed
Jun 2014
Time in Active Review
21 months
excludes 40 months dormant
Completed
construction complete
Project Status
Complete
Estimated Timeline

Permit Issued

June 2019

Permit issued on June 26, 2019. Project moved into construction phase.

Actual permit issuance date from DBI records
Permit issued — plan check completeJune 26, 2019
The Story So Far

The proposal at 33 Norfolk St would add 19 homes in a 5-story building in the Mission. The project followed the AB 2011 ministerial pathway. The June 2019 dossier update records the review as complete, and the tracker now treats feasibility as ineligible because the project is complete.

The site began as a two-story office building beside a five-space surface parking and storage lot. In November 2017, San Francisco Planning found that neither the building nor the site qualified as a historic resource or belonged to a historic district. The Entertainment Commission reviewed potential noise impacts in March 2018 because the property abuts nightlife venues along 11th Street.

Later reporting showed continued efforts to revise the project. SocketSite reported in April 2021 that permits issued in 2019 had not led to a groundbreaking. SIA Consulting had prepared an alternative with 24 units across six stories, two automobile spaces, and 24 bicycle spaces. In November 2022, SocketSite reported that revised plans restored a 30-foot rear sound wall while the new-building permit remained on hold. SFYIMBY identified Paramount Estate LLC as the sponsor and SIA Consulting Corporation as the designer of a five-story proposal with four automobile spaces, 12 bicycle spaces, and an estimated construction cost of $6.3 million.

The latest site account retained the existing office and industrial building and adjacent parking and storage area. Enzyme Community Center SF later operated an unauthorized nighttime-entertainment use there before reportedly vacating in December 2024. On May 7, 2025, the Board of Appeals voted 4-0 to uphold a violation involving the unauthorized use, unpermitted work, and a restroom built without permits.

Sources: San Francisco Board of Appeals (2025-05) · SocketSite (2022-11) · SFYIMBY (2022-11) · SocketSite (2021-04) · San Francisco Entertainment Commission (2018-03) · San Francisco Planning Department (2017-11)
Key Milestones
Jun 2014
Permit Filed
New construction permit filed with DBI
Jun 2014
Electronic Plan Review Activated
Plans distributed to all review stations
Jan 2015
Dormant Period
No plan-check activity for ~40 months — applicant-side pause, not city queue time.
Jun 2019
Permit Issued
Construction can begin
Plan Check Status
Station statuses below are historical; the permit has been issued.
City desk: 20 mo · Applicant: 0 mo · Dormant: 40 mo
Planning (CP-ZOC)
SF Planning Department
Currently in review. 4 cycle(s) to date. Reviewer: Townes Chris.
In Review
Building Code (BLDG)
Dept. of Building Inspection
Currently in review. 1 cycle(s) to date. Reviewer: Ospital Joseph.
In Review
Fire (SFFD)
SF Fire Department
Currently in review. 2 cycle(s) to date. Reviewer: Weiss-Ishai Sagiv.
In Review
Neighborhood Planning (CP-NP)
SF Planning Department
Currently in review. 1 cycle(s) to date. Reviewer: Townes Chris.
In Review
Sidewalk & Street (DPW-BSM)
DPW — Bureau of Street & Mapping
Currently in review. 1 cycle(s) to date. Reviewer: Zhou Andy.
In Review
Water & Sewer (SFPUC)
SF Public Utilities Commission
Currently in review. 2 cycle(s) to date. Reviewer: Tom Bill.
In Review
Public Health (HEALTH)
Dept. of Public Health
Currently in review. 2 cycle(s) to date. Reviewer: Walls Mark.
In Review
Labor Compliance (DFCU)
Office of Econ. & Workforce Dev.
Currently in review. 1 cycle(s) to date. Reviewer: Blackshear John.
In Review

Bottleneck Watch: Planning

Planning is the longest-running active review station on this project.

Construction
Certified for Occupancy
100% complete
Trade permits (electrical, plumbing) are tracked separately by DBI and not shown yet.
Data sources: Data from DataSF Building Permits, Building Permit Addenda with Routing, DPW Street-Use Permits, MOHCD Affordable Housing Pipeline, and Dwelling Unit Completion Counts datasets. Timeline estimates are statistical projections, not guarantees. See DataSF Building Permit Addenda with Routing.