San Francisco / Bayview Hunters Point / 1610 Jerrold Av

1610 Jerrold Av

85-unit 6-story residential project erect a 85 dwelling unit,no basement,6 story with residential apartment and commercial building

Construction Frozen85 UnitsAB 2011 MinisterialDBI Valuation $19.1M
Entitlement
Plan Check
Jun 2020
Awaiting Issuance
Jun 2020
Post-Issuance Addenda
Construction
Complete
Construction: Construction frozen — MOHCD pipeline Aug 2026: 4200 3rd/1610 Jerrold (2019-009) Pre-Construction, Predevelopment Feasibility.
Permit Filed
Nov 2019
Time in Active Review
7 months
Permit Issued
Jun 2020
plan check complete
Project Status
Construction Frozen
Estimated Timeline

Permit Issued

Verified stalled: MOHCD pipeline Aug 2026: 4200 3rd/1610 Jerrold (2019-009) Pre-Construction, Predevelopment Feasibility.

Web-verified real-world status (status_verifications.json)
Permit issued — plan check completeJune 30, 2020
Key Milestones
Nov 2019
Permit Filed
New construction permit filed with DBI
Dec 2019
Electronic Plan Review Activated
Plans distributed to all review stations
Jun 2020
Permit Issued
Construction can begin
Plan Check Status
Station statuses below are historical; the permit has been issued.
City desk: 7 mo · Applicant: 0 mo
Building Code (BLDG)
Dept. of Building Inspection
Currently in review. 1 cycle(s) to date. Reviewer: Zhang Kayi.
In Review
Fire (SFFD)
SF Fire Department
Currently in review. 1 cycle(s) to date. Reviewer: Mann Kerry.
In Review
Sidewalk & Street (DPW-BSM)
DPW — Bureau of Street & Mapping
Currently in review. 1 cycle(s) to date. Reviewer: Theo Devine David.
In Review
Public Health (HEALTH)
Dept. of Public Health
Currently in review. 2 cycle(s) to date. Reviewer: Jones David.
In Review
Water & Sewer (SFPUC)
SF Public Utilities Commission
Currently in review. 1 cycle(s) to date. Reviewer: Garcia Jobel.
In Review
Labor Compliance (DFCU)
Office of Econ. & Workforce Dev.
Currently in review. 1 cycle(s) to date. Reviewer: Blackshear John.
In Review

Bottleneck Watch: Building Code

Building Code is the longest-running active review station on this project.

Construction
Permit issued — no DBI inspection records yet.
Trade permits (electrical, plumbing) are tracked separately by DBI and not shown yet.
Data sources: Data from DataSF Building Permits, Building Permit Addenda with Routing, DPW Street-Use Permits, MOHCD Affordable Housing Pipeline, and Dwelling Unit Completion Counts datasets. Timeline estimates are statistical projections, not guarantees. See DataSF Building Permit Addenda with Routing.