San Francisco / Bayview Hunters Point / 4101 03Rd St

4101 03Rd St

32-unit 5-story residential project to erect a 5-story, type 1a/3a, mixed use bldg w/ 32 residential units and 1 basement.**comply w/ maher ord# 155-13, route to health**

Construction Frozen32 UnitsAB 2011 MinisterialDBI Valuation $7.0M
Entitlement
Plan Check
Jun 2020
Awaiting Issuance
Jun 2020
Post-Issuance Addenda
Construction
Complete
Construction: Construction frozen — MOHCD pipeline Aug 2026: project 2019-009 Pre-Construction / Predevelopment Feasibility.
Permit Filed
Dec 2019
Time in Active Review
6 months
Permit Issued
Jun 2020
plan check complete
Project Status
Construction Frozen
Estimated Timeline

Permit Issued

Verified stalled: MOHCD pipeline Aug 2026: project 2019-009 Pre-Construction / Predevelopment Feasibility.

Web-verified real-world status (status_verifications.json)
Permit issued — plan check completeJune 30, 2020
Key Milestones
Dec 2019
Permit Filed
New construction permit filed with DBI
Dec 2019
Electronic Plan Review Activated
Plans distributed to all review stations
Jun 2020
Permit Issued
Construction can begin
Plan Check Status
Station statuses below are historical; the permit has been issued.
City desk: 6 mo · Applicant: 0 mo
Building Code (BLDG)
Dept. of Building Inspection
Currently in review. 2 cycle(s) to date. Reviewer: Jones David.
In Review
Fire (SFFD)
SF Fire Department
Currently in review. 2 cycle(s) to date. Reviewer: Harshman Kjell.
In Review
Water & Sewer (SFPUC)
SF Public Utilities Commission
Currently in review. 1 cycle(s) to date. Reviewer: Nguyen James.
In Review
Sidewalk & Street (DPW-BSM)
DPW — Bureau of Street & Mapping
Currently in review. 1 cycle(s) to date. Reviewer: Dennis Rassendyll.
In Review
Public Health (HEALTH)
Dept. of Public Health
Currently in review. 1 cycle(s) to date. Reviewer: Jones David.
In Review
Labor Compliance (DFCU)
Office of Econ. & Workforce Dev.
Currently in review. 1 cycle(s) to date. Reviewer: Blackshear John.
In Review

Bottleneck Watch: Building Code

Building Code is the longest-running active review station on this project.

Construction
Permit issued — no DBI inspection records yet.
Trade permits (electrical, plumbing) are tracked separately by DBI and not shown yet.
Data sources: Data from DataSF Building Permits, Building Permit Addenda with Routing, DPW Street-Use Permits, MOHCD Affordable Housing Pipeline, and Dwelling Unit Completion Counts datasets. Timeline estimates are statistical projections, not guarantees. See DataSF Building Permit Addenda with Routing.