San Francisco / Haight Ashbury / 400 Upper Ter

400 Upper Ter

23-unit residential project entitled — awaiting building permit

Entitled — No Permit Yet23 UnitsPlanning Entitlement
Rendering of 400 Upper Ter
RENDERING COURTESY ENERGY CONSULTANT, VIA SF PLANNING FILING 2026-004141PRJ
Entitlement
Aug 2026
Plan Check
Awaiting Issuance
Construction
Complete
Planning Filed
May 2026
Units Proposed
23
net new
Status
Entitled — No Permit Yet
Closed - Approval Ltr Issued
Stage
Entitlement
pre-building-permit
Entitlement Tracking

Entitled — Awaiting Building Permit

Planning entitlement approved. The building permit has not yet been filed with DBI. Full plan-check tracking (station-by-station status, timeline estimate, construction) begins when the DBI permit appears.

SF Planning entitlement record
The Story So Far

A 23-unit housing proposal at 400 Upper Ter secured entitlement in August 2026, moving the Haight Ashbury project through standard entitlement review. Whitfield Architects filed the application in May 2026, and assigned planner Kalani Alcala oversaw the review. The proposal calls for a 4-story building with 0 affordable units.

The project would replace or redevelop a fire-damaged apartment property with a difficult recent history. Public property records updated in February 2026 describe the existing structure as a 21-unit, three-story apartment building constructed in 1964 on a 10,201-square-foot lot.

On April 4, 2022, a two-alarm fire displaced 40 residents and injured a firefighter, the San Francisco Chronicle reported. Firefighters rescued two occupants and a cat. The San Francisco Fire Department said the narrow, dead-end Upper Terrace delayed responding units.

The property remained troubled well after the fire. A November 17, 2025 complaint to the Department of Building Inspection described the building as vacant and still damaged, citing an unrepaired roof and upper-floor conditions that raised concern about a rain-related collapse.

The planning record shows a relatively direct entitlement process, with 0 dormancy periods and 0 dead planning records at the parcel. The parcel has 6 prior permits. The proposal reached entitlement in August 2026 after its May 2026 filing, compared with a typical 9 months to permit.

The project joins a Haight Ashbury pipeline containing 16 projects and 339 units. Entitlement establishes the planning approval, but the record does not list an issued permit or completed project. The latest update therefore marks a significant approval while leaving construction timing unresolved.

Sources: San Francisco Chronicle (2022-04) · San Francisco Fire Department (2022-04) · San Francisco Department of Building Inspection (2025-11) · Redfin (2026-02) · Whitfield Architects
Updates
Entitlement approved2026-08-25
400 Upper Ter wins entitlement for 23 homes
Planning approved the standard entitlement for 23 homes at 400 Upper Ter in August 2026. The recorded mix includes 9 one-bedroom, 12 two-bedroom, and 1 three-bedroom homes, with 0 affordable units.
Plans & Renderings
Key Milestones
May 2026
Planning Application Filed
Entitlement application opened with SF Planning.
Aug 2026
Entitlement Approved
Planning approval granted. Next step: building permit filing with DBI.
Building Permit Filing
DBI permit not yet filed. Full tracking begins when it appears.
Data sources: Entitlement-stage record from the SF Planning Department Records - Projects dataset (Socrata qvu5-m3a2). Full plan-check tracking begins once a DBI building permit is filed. See DataSF Building Permit Addenda with Routing.